��The processing procedure is as below:
�� Receive the 2D/3D data.
�� Do feasibility study.
�� Review the mold standard and requirement, submit it to the designer.
�� Have the verdict meeting to decide the layout
�� Start designing.
�� Print out the preliminary drawing and have the review meeting.
�� Revised the drawing according to the comments on review meeting.
�� Submit the preliminary drawing to customer.
�� Perfect the drawing as per the feedbacks.
�� Submit the drawing to customer again if needed.
�� The customer approve to order & cut steel.
�� Order insert material, mold base, hot runner system (if needed).
�� Issue out the mold drawing and detail drawing.
�� Start manufacturing , QC will check the component after every procedure.
�� Fit the mold.
�� Polishing and assembly.
�� Mold trial T1.
�� Deliver T1 samples to customer.
�� Measuring the samples.
�� T1 mold review meeting.
�� Receive the feedbacks of T1 samples.
�� Modify the mold.
�� T2.
�� Send out the T2 samples for approval.
�� T3 (if needed).
�� Approve OK.
�� Arrange shipping.
|